Infrastructure Development Office established in Nuwakot
Trishuli, Nov 24: An Infrastructure Development Division Office has been set up in Nuwakot to advance reconstruction of physical infrastructures damaged by the Bhotekoshi flood occurred on August 26.
Division chief senior engineer Sachindra Kumar Yadav informed that the Office will also prepare additional plans based on the needs of the area, including the reconstruction and renovation of flood-damaged road networks and bridges.
"The Office came into operation after formulating plans for the post-disaster recovery, development and upgrading of national priority road networks, construction of bridges and roads. While forwarding reconstruction drive, special attention will be paid to the connectivity to the local level centres, service centres and important settlements," he said, adding that even the strategic agricultural roads, alternative highways and tourist trails count much for it.
He further shared that the Office had got authority to implement 50 plans that also includes the reconstruction of 15 rural roads devastated by the flood.
The government has taken into account the issues such as environmentally friendly, sustainable and resilient infrastructures in Rasuwa, Nuwakot and Dhading in line with the budget and programmes. The Office also carries out identification of needs, feasibility studies, surveys, detailed project reports, cost estimates including designs and quality test.
